Two renovation quotes can describe the same rooms and price very different work.
The fairest comparison is the amount each contractor would charge to deliver the same finished scope. Start by aligning the work, then check allowances, payment timing and handover.
01. Compare the work room by room

List what must happen in each room, including removal, protection, disposal and making good. If one bathroom quote includes removing and reinstating finishes while another assumes an overlay, ask both firms to price the method you want before comparing totals.
Give each firm the same floor plan, brief and finish assumptions. Mark each line as included, excluded or still to be confirmed, and label whether the figure is an early estimate or a quote based on a site visit. Request revised figures in writing before deciding.
02. Separate confirmed prices from allowances

An allowance may cover tile supply up to a stated unit rate while labour, delivery or extra quantities are priced separately. Ask how overages and underspends are handled. Then estimate what you would actually pay using a finish you are likely to choose.
Say one quote is S$500 lower but omits S$350 of disposal and leaves a S$200 tile upgrade outside its allowance. Once those costs are added on the same tax basis, the apparent saving becomes a S$50 difference in the other direction. The numbers are illustrative.
03. Make vague specifications comparable

Ask each firm to identify the cabinet board, door finish, hinges and drawer runners. For a countertop, check thickness, cut-outs, edging and installation. Put those details side by side so you can decide which differences justify the price.
If two quotes both say “soft-close”, ask which hinges and runners are included and which doors or drawers they apply to. Then compare the details you will actually use every day.
04. Account for changes and work excluded from the quote

If an item is clearly excluded, price it separately before choosing a contractor. For unknowns that only become visible after work starts, agree on how the contractor will explain, price and document changes before the affected work goes ahead. CCS guidance on fair renovation practices.
Keep a separate line for foreseeable extras such as owner-supplied fixtures or items another trade will connect. Site discoveries can be handled through the written variation process.
05. Compare the payment schedule and handover terms

Check the deposit, what triggers each progress payment, and what the warranty covers. A usable milestone identifies an actual deliverable, such as cabinetry installed in specified rooms. Ask when you can inspect that milestone and how outstanding items will be recorded.
Finish the comparison with a short list of unresolved items for each contractor. A clear response can help you weigh the price against how the project will be coordinated.