A practical condo renovation guide covering estate approvals, new versus resale units, lift bookings, deposits and handover.
Before you finalise the design or book a start date, ask your condo management office for the current renovation pack. It tells you what the estate needs to approve, how your contractor can access the unit and what restrictions could change your plan. The earlier you have it, the easier it is to compare quotes for work your contractor can actually carry out.
01. Get the estate rules before you finalise the design

Ask the managing agent or management office for the renovation form, house rules, and submission checklist. The management corporation, commonly called the MCST, may require drawings, contractor details, insurance information and proposed dates. Confirm what counts as minor work and which parts of your plan need written approval before work starts.
Agree who will handle the submission and respond if management asks for a revision. If the approval has an expiry date, build that into the work schedule. Ask how revised drawings or changes to the scope should be submitted during the renovation.
02. Check what you can keep in a new or resale condo

In a newly handed-over condo, inspect the unit and photograph defects before covering or altering finishes. Check your Sale and Purchase Agreement for the defect reporting process and applicable period. Report relevant defects to the developer and coordinate access for repairs before work conceals those areas. BCA guidance for condo owners.
In a resale condo, ask about past leaks or repairs and inspect the flooring, plumbing, wiring and air-conditioning as appropriate to the scope. Decide which fittings can stay, which need repair and what needs replacement. Have the relevant trades investigate concerns before you commit to finishes that would cover them.
| Planning check | New condo | Resale condo |
|---|---|---|
| Start with | Inspect and document defects. Check the developer’s rectification process. | Check past repairs, leaks and the condition of existing finishes and services. |
| Decide what to retain | Review usable developer-provided flooring, fittings and cabinetry. | Retain sound items where they fit the plan. Price repairs and replacements separately. |
| Allow time for | Defect rectification where it affects the planned work, plus estate approval. | Site checks and any removal or service work, plus estate approval. |
| Compare quotes on | The upgrades you actually want and protection of retained finishes. | The extent of removal, repairs, disposal and making good. |
03. Check walls, balconies and visible changes early

If you want to remove a wall, ask management what plans and professional assessments it requires. Structural elements such as slabs, beams and columns require professional assessment before alteration. If the proposal affects structure, common property or the building’s external appearance, confirm the required approvals with management and the relevant professionals. Some work can also require separate authority approval. BCA’s strata guide to carrying out works.
Balcony screens, blinds, grilles, windows and air-con equipment can be subject to estate specifications. A mezzanine or work over a void needs separate assessment before it is priced as a viable option. Get confirmation for the specific design and fixing details before paying for fabrication.
04. Plan the deposit, work hours and lift bookings

Ask what renovation deposit is payable, which fees are separate and how the estate handles inspections, deductions and refunds. Check who pays for protection of lifts and corridors. Keep the management receipt separate from your contractor’s payment schedule.
Book large deliveries and debris removal against the allowed hours and lift slots. Measure the route from unloading to the unit before ordering a long countertop or tall wardrobe panel. Ask where materials can be unloaded and who will protect and inspect the shared areas.
05. Price the agreed scope and work backwards from move-in

Separate the scope into retained finishes, removals, repairs and new installations. When comparing quotes, line up protection, disposal, making good and owner-supplied items. Ask which costs depend on site checks or the estate’s conditions, and put the process for pricing and approving changes in writing.
Work back from your move-in date. Allow time for management approval, fabrication, estate bookings and a final walkthrough. A new condo with usable finishes can have a different programme from a resale unit that needs several trades. Ask for an agreed schedule that shows what needs to happen before the next trade starts.
06. Close out the work with the contractor and management

Walk through the finished unit together and compare it with the agreed drawings and scope. Make a dated list of touch-ups and agree who will resolve each item. Collect the applicable warranty documents, product details and any approvals or records you need for future maintenance.
Ask management how to notify them that work is complete and whether a common-area inspection is needed for deposit release. Confirm when protective coverings can come down and book your move-in separately if the estate requires it.
Planning a condo renovation? Share your floor plan and the estate renovation guidelines with Formstill Studio so we can discuss the scope, approvals and schedule together.
For information and reference only. The scope, methods and sequence for your renovation depend on actual site conditions, applicable requirements and the on-site assessment and professional judgement of the specialists carrying out the work.
