GET A QUOTE

Materials & Finishes

Epoxy Flooring vs Microcement: Which Finish Suits Your Home?

Compare epoxy flooring and microcement for Singapore homes by appearance, scratches, wet grip, repairs and suitability over existing tiles.

Epoxy Flooring vs Microcement: Which Finish Suits Your Home? — Formstill Studio renovation guide

Epoxy flooring and microcement can both give your home a continuous finish with few visible joints. Epoxy can give a more even resin finish, while microcement usually shows subtle variation from the trowel. Before choosing, look at how the finish will wear, how it will grip when wet and whether your existing floor can take an overlay.

Epoxy flooring vs microcement at a glance
What to compare Epoxy flooring Microcement flooring
Appearance Often more uniform. Gloss, satin and textured finishes depend on the system. Typically has a hand-trowelled look with variation in tone. Sheen depends on the sealer.
Scratches and wear Grit and dragged furniture can mark the surface. Scratches can stand out on dark or glossy finishes. Grit and furniture can mark the protective sealer. Ask what renewal involves when wear becomes visible.
Stains and cleaning Check the product’s stain and chemical resistance, and which cleaners are compatible. Stain resistance depends heavily on the sealer and its condition. Wipe up spills and follow the care instructions.
Wet grip Ask for slip test results for the specified texture and topcoat under the intended wet conditions. Ask for the same evidence for the finished, sealed system, especially for a barefoot shower floor.
Repairs A patch can show a difference in colour or sheen. Ask whether the surrounding area would need recoating. A patch can show a change in tone or trowel pattern. Ask how the installer would blend it and restore the sealer.
Existing floor Check for a sound, dry base and whether the proposed system is approved for the existing substrate. Check tile bonding, cracks, moisture and the preparation needed to prevent old joints from showing through.

01. Ask what the epoxy quote actually includes

A uniform satin epoxy-style floor in a compact utility room

Epoxy flooring is a resin system. A thin coating, a thicker self-levelling finish and a textured system can look and wear differently. Ask for the primer, build coats, topcoat and finish to be listed. For a floor next to sunny windows, also ask how the proposed system handles UV exposure and colour change. See our epoxy flooring guide for more on the different systems.

02. See how much variation to expect from microcement

Daylight reveals the tonal variation of a matte microcement-style floor

Microcement is typically applied in thin layers and sealed. Its character comes from the trowel marks and subtle changes in tone, which can look different across a whole room than on a small swatch. Ask to see a larger sample under your lighting. The term “epoxy-based microcement” can also appear on quotes. Ask what the installer is proposing and what will protect the finished floor. See our microcement guide for more on the finish.

03. Check wet grip, drainage and how the floor will be repaired

A textured seamless bathroom floor beside a shower drain

For a bathroom, ask for wet slip test results relevant to the exact finish and barefoot use. Texture can help with grip, but a rougher floor can take more effort to clean. Ask the installer to check floor falls, the drain and the threshold. A sealed surface is only one part of the bathroom assembly. Any suspected leak or waterproofing fault needs to be investigated before coating.

For a living or dining room, consider chair legs, grit near the entrance and what happens if a heavy object drops. Ask how a worn spot or chip would be repaired, how visible the patch could be and when furniture can go back after installation.

04. Inspect the existing tiles before committing to an overlay

A specialist checks the condition and level of an existing tiled floor before overlay

Have the installer check for loose or hollow tiles, cracks, dampness and changes in level. Ask how grout lines will be treated, which joints must be carried through and how the new finish will meet doors and adjoining floors. If the base is unsuitable, the scope may need to change before either finish goes down.

For an HDB flat, ask your renovation contractor to check the proposed scope against the rules for your flat, especially if work involves bathroom floor finishes. HDB building works guidelines. For more on the decision, see our bathroom hacking versus overlay guide.

For information and reference only. The scope, methods and sequence for your renovation depend on actual site conditions, applicable requirements and the on-site assessment and professional judgement of the specialists carrying out the work.

← Back to all guidesBack to homepage →
LET'S BEGIN

Tell us about
your space.

Questions after reading? Share your property type, budget and renovation plans. Our team can follow up with practical next steps.

Chat on WhatsApp ↗
WhatsApp ↗
Scroll to Top