GET A QUOTE

HDB & Condo Rules

HDB, Town Council or Police? Who to Contact When Something Goes Wrong

Find the right contact for lift faults, ceiling leaks, new HDB flat defects, neighbour disputes and emergencies in Singapore.

HDB, Town Council or Police? Who to Contact When Something Goes Wrong — Formstill Studio renovation guide

A broken lift, a damp bathroom ceiling and a dispute with a neighbour can all happen in the same block. Who to contact depends on what happened, whether anyone needs immediate help, and whether the issue involves your flat or a shared part of the estate.

Who to contact for common HDB issues
What happened Who to contact first What to do
Fire or medical emergency SCDF at 995 Give your block, floor and unit number and explain what is happening.
Immediate police help, such as violence or a crime in progress Police at 999 Use SMS 70999 if calling is unsafe or you cannot speak.
Lift fault, broken corridor light or obstruction in a common passage Your Town Council Give the exact location and lift number if relevant. For a lift entrapment, use the lift alarm or intercom and the emergency contact displayed in the lift.
Water stain on your ceiling Start with the likely source For a suspected leak from the flat above, speak with the neighbour and arrange an assessment. For a suspected roof or common-property leak, contact the Town Council.
New flat defect or renovation permit question HDB or your precinct’s Building Service Centre, as applicable Use HDB’s defects process for original flat defects. Ask your renovation contractor about permits for proposed work.
Recurring neighbour noise without immediate danger Speak with your neighbour if safe, then consider the Community Mediation Centre Describe the times and impact. For a non-urgent issue in a shared area, OneService can help route a report.

Official emergency contacts are listed by the Singapore Police Force and the Singapore Civil Defence Force.

01. Contact the Town Council for shared estate areas

Shared lift lobby in an HDB block

Report common-area maintenance such as faulty lifts, damaged corridor lights and obstructed common passages to the Town Council. If you are unsure who manages a non-urgent municipal issue, submit it through OneService with the location and a photo if safe. If you need to dispose of old furniture before a renovation, check your Town Council’s bulky-item rules and whether your items qualify before leaving anything in a shared area. OneService reporting guidance.

02. Trace the source of a ceiling leak

Water staining at the corner of a bathroom ceiling

Take photos and note when the damp patch appears. A leak between flats may require the two owners to arrange repairs together. HDB explains that where the floor or ceiling slab between flats needs repair to resolve the leak, the owners arrange the work and share the cost. If the source is the block roof or other common property, contact the Town Council. A top-floor stain can still have other causes, so establish the source before deciding who should handle the work. If you need help progressing an inter-flat leak, contact HDB for guidance. HDB ceiling leak guidance.

03. Use HDB’s process for new flat defects and permit questions

Homeowners reviewing a flat layout before renovation

HDB’s standard Defects Liability Period for a newly completed flat is one year from key collection. Report original defects using HDB’s online process or the precinct’s Building Service Centre if available. Photograph affected areas before renovation starts. For an issue with work installed by your renovation contractor, raise it with the contractor and identify the affected work. For proposed works such as wall demolition, ask your contractor to check the requirements and submit any necessary permit application before work starts. HDB new flat defects process · HDB renovation permits.

04. Handle recurring neighbour issues through the right channel

Neighbours having a calm conversation along an HDB corridor

If it feels safe, explain the specific issue and suggest a practical change. For recurring noise, keep a simple record of dates, times and what you heard. If speaking directly does not resolve it or you prefer facilitated dialogue, the Community Mediation Centre can help with suitable disputes. For severe, persistent noise or hoarding, MinLaw explains how agencies can refer eligible cases for further intervention. If the situation becomes threatening or requires immediate police assistance, use the emergency contact above. Community Mediation Centre · MinLaw guidance on neighbour disputes.

For information and reference only. The scope, methods and sequence for your renovation depend on actual site conditions, applicable requirements and the on-site assessment and professional judgement of the specialists carrying out the work.

← Back to all guidesBack to homepage →
LET'S BEGIN

Tell us about
your space.

Questions after reading? Share your property type, budget and renovation plans. Our team can follow up with practical next steps.

Chat on WhatsApp ↗
WhatsApp ↗
Scroll to Top